Reclamation and Overlay Project

Final Draft Plans

Overview

The 2023 Reclamation and Overlay Project includes the following streets in the base bid:

Project location map (PDF)

  • Harrison Court (Mill and Overlay)
  • Johnson Court (Mill and Overlay)
  • Grant Drive (Mill and Overlay)
  • Grant Court (Mill and Overlay)
  • Hayes Drive from Fillmore Street to Johnson Street (Mill and Overlay)
  • Carter Drive – Fillmore Street to Northfield Middle School (Mill and Overlay)
  • Heritage Drive – Hidden Valley Apartments to Lincoln Street (Pavement Reclamation)
  • Hidden Valley Road – Jefferson Road to Heritage Drive (Pavement Reclamation)
  • Peterson Drive – Hidden Valley Road to Lincoln Street (Pavement Reclamation)
  • Lincoln Street – Heritage Drive to Peterson Drive (Pavement Reclamation)
  • Thomas Court (Pavement Reclamation)
  • Adams Street – Lincoln Street to Roosevelt Drive (Pavement Reclamation)
  • Taylor Court (Pavement Reclamation)
  • Adams Court (Pavement Reclamation)
  • Tyler Court (Pavement Reclamation)

Walking, biking and pedestrian improvements

In addition to the proposed street surface improvements, the City of Northfield will also complete the following walking/biking/pedestrian infrastructure improvements: 

Nevada Street/Ninth Street/Maple Street – Fourth Street to Maple Street – Bike Boulevard

Maple Street – Woodley Street to Ames Street and Meadowview Drive to Jefferson Parkway – Protected Two-Way Bikeway

Maple Street – Ames Street to Meadowview Drive – Off Street Trail

Roosevelt Drive – Protected Two-Way Bikeway

Heritage Drive/Lincoln Street/Adams Street – Hidden Valley Apartments to Roosevelt Drive – Off-Street Two-Way Bikeway

Lincoln Street - Adams Street to Peterson Drive - Protected Two-Way Bikeway

Peterson Drive/Hidden Valley Road – Jefferson Road to Truman Park – new sidewalk installation (North and West side)

TH 246 – Anderson Drive to the Roundabout – Off Roosevelt Drive

Adams Street - Roosevelt Drive to Lincoln Street

Pedestrian crossing improvements

Woodridge Apartment Entrance (Off Roosevelt Drive) – Enhanced Signing and Striping

Adams Street and Roosevelt Park – Bumpout (north side) and Enhanced Signing and Striping

Heritage Drive and Hidden Valley Road (Heritage Park) – Raised Crosswalk, Bumpout (north side) and Enhanced Signing and Striping

Heritage Drive and Valley Drive (Heritage Park) – Bumpout (north side) Enhanced Signing Striping)

Additional street improvements

Due to anticipated high construction costs, the City of Northfield will be bidding the following street improvements as a Bid Alternate. The decision to complete these street improvements will be made after bidding is complete:

  • Anderson Drive from TH 246 to Aspen Street (Mill and Overlay)
  • Sunny View Drive from Sunny View Lane to Sibley View Lane (Mill and Overlay)
  • Sunny View Lane from Sunny View Drive to Arbor Street (Mill and Overlay)
  • Arbor Street from TH 246 to Aspen Street (Mill and Overlay)
  • Aspen Street/Aspen Court South Dead End to Cul-de-sac (Mill and Overlay)

What your new street will look like

See a rendering of what the proposed street improvements will look like at the following locations:

  1. Lincoln Street from Heritage Drive to Adams Street
  2. Lincoln Street from Adams Street to Peterson Drive
  3. Maple Street from Woodley Street to Ames Street
  4. Roosevelt Drive

View proposed project renderings

Feasibility study

The process began with the Northfield City Council ordering a feasibility study on June 21, 2022. The feasibility study examined the proposed street and utility improvements along these street corridors to determine whether the project – as proposed – is feasible, cost effective and necessary. The City Council approved the feasibility report at the January 3, 2023 City Council meeting, and authorized preparation of plans and specifications.

Feasibility report (PDF)

Project process

The project process is the actions the City of Northfield utilizes for local improvements during project development. This step-by-step process includes opportunities for City Council and residents to provide input on the proposed project.

Project Process

Signing up for project updates

Stay informed on project progress and engagement opportunities.

Sign up for email and text updates

Project updates

March 3, 2023

February 27, 2023

Project meetings

Neighborhood Meeting #1

Wednesday, November 9, 2022
5:30 p.m. to 7:00 p.m.
Northfield Middle School Cafeteria - Door #1
2200 Division Street South, Northfield

Neighborhood Meeting Letter #1

Presentation

Informational Boards

Neighborhood Meeting #2

Wednesday, March 1, 2023
5:30 p.m. to 7:00 p.m.
Northfield Middle School Cafeteria - Door #1
2200 Division Street South, Northfield

Neighborhood Meeting Letter #2

Informational Boards

  1. Sean Simonson

    Sean Simonson

    Engineering Manager

  1. Flashing Yellow Arrow traffic signal

    Lane closures on Highway 3 to improve traffic signals

    Drivers can expect lane closures and traffic signal disruptions on Highway 3 at Second and Fifth streets from June 6 through 16 as the Highway 3 Signal Improvements Project moves into final stages of construction. Lane closures...
  2. Zaya Detert winning poster

    “Be the Solution to Stormwater Pollution” Poster Contest 2023 winners

    Zaya Detert (grade 2 and 3) and Laurel Benson (grade 4 and 5) won first place in the 2023 “Be the Solution to Stormwater Pollution” Poster Contest. Students from all five Northfield elementary schools submitted 171 posters for the contest. Stormwater poster...
  3. Flashing Yellow Arrow traffic signal

    Highway 3 signal improvements

    Project will begin the week of May 1 on Highway 3 from Second Street in Northfield to Hester Street in Dundas. It includes adding emergency vehicle traffic signal preemption, flashing yellow left turn signals, and replacing standard lighting with LED. Signal improvements...
View All